ROUGH WORK SESSION:

San installation, construction site preparation; Load testing, excavation works, concrete works, roofs; Building a wall covering, paint walls and ceilings; Masonry and decorating front, Installation of electrical systems, water, refrigeration, wall cable, lightning protection systems; Built gates, fences, Paving yard (if any).